Longmont Winter Chemical Facility

OWNER:
City of Longmont

PROJECT SIZE:
10,500 SF new metal building
3,600 SF metal building, remodel
CONSTRUCTION COST:
$2,900,000

COMPLETED:
February 2020

LOCATION:
Longmont, Colorado

DELIVERY METHOD:
Design-Bid-Build


The Longmont Winter Chemical Facility project included demolition of the existing buildings, construction of the new salt and magnesium
chloride storage building, and the remodel of the existing fleet vehicle storage and maintenance building. An ice slicer storage/dumping pump station and through-truck circulation were vital program elements of this project.